top of page

Polyaspartic
Industrial & Residential Applications

Polyaspartique-6.jpg

Hybrid Polyaspartic
(Slow)
Ratio 1.5A: 1B

  • 100% solids, excellent gloss finish, low VOC content

  • Can be applied as a finish coat and for metal floors

  • Base coat = 8-10 mils

  • Top coat = 10-14 mils Metallic top coat = 25 mils

  • Working time (curing time) 6-8 minutes

  • Drying time 2 hours

  • Application method: Squeegee and/or roller

Epoxy-couleur solide2.jpg

Hybrid Polyaspartic
(Fast) Ratio 1A: 1B

  • 85% solid, fast hardening

  • Basecoat = 8-10 mils

  • Top coat = 10-14 mils

  • Working time (curing time) 15-20 minutes

  • Drying time 60-90 minutes

  • Application method: Squeegee and/or roller

Polyaspartique-7.jpg

PREPARATION STEPS FOR A SMOOTH FINISHED FLOOR

Step 1

Surface preparation

Step 2

Colored primer:  8 mils

Step 3

(optional if repairs) Colored primer: 8 mils

Step 4

Colored solid coat: 12 mils

Calcul pour qté de produits.jpg

HOW TO CALCULATE PRODUCT  QUANTITY PER COAT

This way of calculating applies for any type of application according to the ratio.

 OUR BEST-SELLING TOOLS 

bottom of page